Terrys Relay – Update 10

Thretford came and went with me doing all of an hours work on the van Knocked in knock in edging on 7 small cupboard doors all weekend (y)Yesterday I got around to hanging the doors and after the weekend showing people what I was going to do with 6 out of 7 people telling me not to go white and stick to wood -I did them in white :DNow Snowbird Dave and Pat called to pick some stuff up today and Dave though the white plastic was a protective film I had put on the doors :D:(after they left I went across to Julie’s and got her to come over for another opinion -then Paul called and the upshot is I am re making all the doors :DBelow is a couple of pics of them in white :):D
terry

Terrys Relay – Update 9

Monday’s update -It was peeing it down until 1 o’clock so I took delivery of the shower room sink then went and got the water tanks and a few other bits –(y):)-After it stopped raining I went out and slowly got started on the shower room front and the wardrobe front (y)-I also completed the shower/loo door just to see what it looked like -I like it so it could be crap in others eyes :DAnyway I cut all the other wall unit doors to size and stuck the face finish on ready for trimming and edging tomorrow weather permitting (y)-Paul arrived on his way home from work and tried a couple of things on the hydronic heater-no luck so whole unit was replaced and this fired up on the second attempt (y)(y)(y)After clearing its throat it runs sweet :)Paul said he knew he had wired it all up good so it made his day and off he went after spending all of 25 mins on it :D-he managed a coffee though ;)
terry

Terrys Relay – Update 6

Saturday update -I got a couple of hours in yesterday (Friday) and made a start on the rear upper cupboard before the heavy rain soaked me -Today both Paul and I had a good day without much going wrong :DGot pipes for gas and wires for fridge/freezer connected to said F/F but nowhere else-just ready for connections to be made at other ends :)and holes cut for F/F vents -Started on some framework for cupboards and bed bases (y)Allthought the pics show it all untidy it’s simply that we throw all tools etc into the van once a decision is made to pack in for the day so they can be locked up then I decide to take pics :LOL::D

Terrys Relay – Update 5

TODAY’S UPDATE WE HAD TO CRASH ON AND GET SHOWER MEASUREMENTS OFF THE NET AND HOPE THAT THEY ARE CORRECT SIZES FOR THE SHOWER TRAY ETC sorry caps- -finished boarding ceiling and got the walls done -got a couple of the shower/loo side wall all cut and scribed -the layouts changed a bit again but it could change back :LOL::DVeltrim to the back pillars and above sliding side door -Packed in at 4 pm -got to mow grass and cut some foams for Billy and Julie -having tomorrow off and weds going to Magnums for windows/loo/shower tray and a fridge
terry

Terrys Relay – Update 4

What a surprise Paul turned up at 10.30 so we had a coffee and discussed the layout :DAfter deciding what we thought would work out best we decided to fit the Heki roof so no changing our minds now :LOL:As we fitted the roof the solar panel got delivered so that was also fitted and then we decided to change the layout yet again and again and again :LOL::LOL::LOL:Then we made another decision that was decided for us by the fact that we had cut a bloody big hole in the roof and there was no moving the Heki :DPaul is happy we have all the wires in place/lights cut out -so now all we have to do is the furniture :LOL::D Got no windows so these will have to be fitted next weekend -not ideal but we can get over it -Also the loo and shower tray would have been good to have, but hey ho we have measurements so we can crack on and hope it fits when I pick then all up next week —
terry

Terrys Relay – Update 3

Today’s update all insulation done (y)-Now got to wait for a decision on Saturday morning on the layout :(Pauls already started to moan about wires and where/how he get’s them to where he wants them :) so he’s asked me to stop working until we make the decision on Saturday —
Not as easy as you may think because we not only have to decide on the layout but where things like heating,boiler and water has to go -so it looks like things are on hold until I make my mind up and we both decide where things need to live once the layout is decided on -SHOULD BE FUN LISTENING to the arguments Sat morning :D;)

Today I made a start on the relay

Today I made a start on the relay (y)The day started with me emptying it /insulation boards fridge/freezer and a few batteries -Then removed the bulkhead and one side lot of panels (y) This then left me clear to start insulating the van.Firstly I did it in a bubble insulation followed by Kingspan and lots of gun applied foam -There are a lot of big voids on the relay which were stuffed with bits of KS and then injected with the foam –